Logo Moderon

+7 (495) 683 89 66

Construction & engineering services for railroad spur track                                                                                                                                           РусFlag

ONLINE CALCULATION OF APPROXIMATE COST WITHOUT MATERIALS

Services Unit of measurement Quantity (put value) Cost including VAT, rub.
CONSTRUCTION & REPAIR
1 Major or medium track repair concrete 1 km
0
wooden 1 km
0
2 Plan and profile track correction concrete 1 km
0
wooden 1 km
0
3 Major or medium railroad switch repair concrete 1 set
0
wooden 1 set
0
4 Сross tie replacement concrete 1 pcs
0
wooden 1 pcs
0
5 Rail replacement (length 12,5 m) 1 pcs
0
6 Major repair of railroad moving 6 meters long (if length 8 m, then put value 1,33; if 10 m - 1,67; if 12 m - 2, etc.) 1 set
0
7 Counterrail installation in curve sites of railroad spur track 1 m
0
8 Railroad drainage tray installation 1 m
0
9 Track buffer stop construction 1 set
0
MAINTENANCE
10 Track maintenance (per month) 1 km
0
11 Railroad switch maintenance (per month) 1 set
0
12 Railroad crossing maintenance (per month) 1 set
0
ADDITIONAL ENGINEERING SERVICES
13 Rail flaw detection with conclusion drawing 1 km
0
14 Track inspection with conclusion drawing 1 km
0
15 Track geodetic survey (control) 1 km
0
16 Railroad spur track technical passort development (without submit for approval) 1 km
0
17 Instruction on the procedure for maintenance and traffic on the rail track development (without submit for approval) 1 km
0
TOTAL
0

The final cost may differ from the calculation both in smaller and bigger side, depending on the performance of work, i.e. conditions region, time, local conditions and individual customer requirements.

In case of your interest we are ready to calculate the exact cost of services as soon as possible, and also to organize a meeting with our experts.